PHEVMax

Suzuki Jimny 1.5 → Smart #1 Pro+: what you would save

Side-by-side annual running cost: your Suzuki Jimny 1.5 vs an electric Smart #1 Pro+. UK 2026 fuel and electricity prices, 10,000 miles a year, home charging at 7.0p / kWh.

Your current Suzuki Jimny 1.5£2,272/yr (22.7p/mile at 35 mpg petrol)
Electric Smart #1 Pro+£184/yr (1.8p/mile at 3.8 mi/kWh)
Annual saving£2,087 (92% cheaper)
Battery range273 miles WLTP · ~251 miles real-world
SeatsCurrent: 4 · New: 5
The honest take. At 10,000 miles a year the Smart #1 Pro+ is 92% cheaper to run than your Suzuki Jimny 1.5. The caveat on an EV: this maths assumes home off-peak charging. If you cannot charge at home and rely on public rapids, redo the numbers at 50-70p/kWh instead of 7.0p and the picture shifts. Purchase price and finance usually swamp running cost anyway, so the full decision needs those added in.
Run your own numbers Opens pre-loaded with the Smart #1 Pro+ vs your mileage and tariff